Modular building foundation

Modular buildings and eco homes on screw piles

Modular and timber-frame construction is fast: the modules arrive finished from the factory. The foundation has to be just as fast and sustainable. Screw piles can be loaded at once, are removable and use no concrete.

Calculate your foundation Request a quote

Timber-frame home under construction on a steel frame on screw piles in Bouillon

Why no concrete?

  • Ready when the modules arrive, no curing time in the schedule
  • A ring beam all round and an extra line of piles under every module joint
  • Circular: piles are removable and reusable, the ground stays clean
  • 60 to 80% less CO₂ than a concrete foundation
  • Also in large numbers: an emergency village of 150 homes in 2 weeks

See the project: modular home on screw piles →

Which foundation?

Screw piles under a ring beam

To the module builder's foundation plan, with an extra line under the module joints.

Timber frame

Intermediate lines of piles under load-bearing walls. Our pile calculator works it out for a two-storey home.

Large projects

For schools, offices or emergency housing we start from CPT soundings and work with your engineer.

How it works

How it works on site

  1. PlanYou send us the module builder's foundation plan.
  2. Screwing inWe screw the piles down to bearing ground and measure the torque of every pile.
  3. To levelAdjustable pile heads absorb level differences.
  4. PlacingThe modules go straight onto their foundation.

Frequently asked questions

Can a modular home go on screw piles?

Yes. We install the piles exactly to the module builder's plan, with a ring beam and extra piles under the joints.

Is it sustainable?

Yes. No concrete, reusable piles and 60 to 80% less CO₂.

How fast for many homes?

For an emergency village in Oostakker we founded 150 homes in two weeks.