Screw piles into the bearing layer
Also for a 44-tonne 20 ft container, in tension and compression.
Battery storage foundation
Battery parks need to be built fast and often sit on soft or made ground. Instead of a concrete slab on hardcore, screw piles carry a steel frame to which the containers are fixed directly.

Also for a 44-tonne 20 ft container, in tension and compression.
Welded on site or fixed with clamp connections. Levelling plates on the pile heads give the alignment.
Based on CPTs, our manufacturer Paalupiste works out a foundation proposal, with your engineer.



Yes. Based on CPTs, the manufacturer proposes piles into the bearing layer and a steel frame.
With levelling plates on the pile heads we align to within 1 to 2 mm.
Up to about 50 piles per day per crew.
Send us the dimensions or a plan. We reply within two working days.