Magnum Push Piers
Steel push piers down to deep bearing ground, each tested.
Knowledge · Injection
At a loading dock or station platform the heaviest load comes on the edge: lorries, forklifts or passengers. If the ground gives way, the edge tilts, level differences appear and the concrete spalls. With expanding resin we fill the void and lock the edge again, without demolition.

Along the edge and on both sides of the joints we drill down to below the slabs. The expanding resin fills the void, compacts the ground and lifts the slab where needed, under continuous laser control. After about 15 minutes it has 90% of its final strength.
Our team has already worked for logistics companies, distribution centres and the railways, where every hour of downtime counts.
With serious damage, have a structural engineer assess the situation. Soiltek is a specialist contractor: we record, measure, propose a technique and carry out the repair, in consultation with your engineer.
Steel push piers down to deep bearing ground, each tested.
Expanding resin strengthens the ground under the foundation, without digging.
Sunken concrete floors back to level.
First the cause, then the right technique.
Our team has been injecting since about 2006. Since then we have carried out hundreds of injection projects in Belgium and Luxembourg, from homes to large industrial sites. An overview by sector:
Injection under floors and foundations at chemical sites and terminals in the port of Antwerp, and at a lock.
Warehouse floors and expansion joints for logistics companies, distribution centres and supermarkets.
Production halls for car manufacturers and for steel, textile and concrete companies.
Floors and foundations at breweries, a water bottling plant and food companies.
Work for the railways, along a motorway, at a bridge, at a naval base and at an airport.
Schools, municipal buildings, a post office and a research institute.
Foundations of high-voltage substations.
Hundreds of private homes across Belgium and Luxembourg.
We work zone by zone. A treated zone is usable again after about 15 minutes.
For rail and logistics we plan within the window the operator allows.
Injection solves the void and settlement. A contractor then repairs broken edges.
Send us photos, a plan or the dimensions of the area. We reply within two working days.
Request a quoteRead also: Lifting a subsided industrial floor without shutting down your operation · Resin injection for infrastructure: lifting without a long closure · Is injection resin safe for the soil and groundwater?