Screw piles
All pile types and their advantages.
Knowledge · Control
Installation torque gives a good check on every screw pile. Sometimes you want more certainty, for example on a large project or in unusual ground. Then you load a pile and measure how it responds.

With Magnum Push Piers the test is built in: the building itself is the counterweight. In Erquelinnes every pier was held at 400 bar, about 20 tonnes of reaction force, for at least 15 minutes, with no significant additional penetration. Everything is recorded in an installation report per pier.
Eurocode 7 uses correlation factors that depend on how much you know about the ground and the piles. With more soundings or a load test that factor can come down, making the design more economical.
Soiltek is a specialist contractor, not an engineering firm. We provide the manufacturer's product data and align the pile proposal with your structural engineer.
Sources: NBN EN 1997-1 (Eurocode 7); H.A. Perko, Helical Piles, Wiley, 2009; installation report Erquelinnes 2026.
All pile types and their advantages.
For light and medium structures.
How many piles do you need?
All topics in one place.
For every screw pile we measure the installation torque. A load test is done where the project calls for it.
That depends on the load and the number of piles. We include it in the quote where needed.
We screw or push deeper, or choose a heavier pile, and test again.
Send us the dimensions or a plan. We reply within two working days.
Request a quoteRead also: Installation torque and capacity: how you know a screw pile will hold · A CPT sounding explained: how to read the ground · Foundation repair methods compared